国产粗大内射成人_亚洲日韩成人在线_最新手机av网址_欧美一区精品xc_欧美一区精品xc_思思热思思热成人网站_亚洲区无码DVD_国产欧美日本精品

Hello, welcome to visit the official website of Quzhou Wentian Chemical Co., Ltd.
Service Tel: +86-570-3083319 中文English

PRODUCTS

+ High Molecular Fluoropolymer Self-adhesive Coiled Material+ Fluorocarbon anti-corrosion coating series+ Fluorocarbon building exterior wall waterproof decorative coating+ Fluorosilicone Nano Bamboo Wood Anticorrosive Coating+ Thermal insulation coating+ Glass explosion-proof insulation film
Fluorocarbon chemical heavy-duty anti-corrosion coating

 

Product introduction: This product is made of fluorocarbon resin, high-quality pigments, fillers, BYK and other excellent additives. It is a two-component reactive coating with Bayer curing agent to form a film. It can effectively prevent the base surface from being damaged by various corrosive media and prolong the service life of the coated object.

Uses: Suitable for anticorrosion of urban landmark steel structures, large bridges, ships, chemical plants, and power plant steel structures that are difficult to maintain.

Features: The so-called heavy anti-corrosion is generally understood as the environment where the steel structure or equipment is very harsh, the maintenance is very difficult, and the chemical pollution is serious. Matching anti-corrosion methods must be adopted. The coating used to meet this requirement is the key. The product has super weather resistance in hot and humid environments, and has good corrosion resistance and usability in environments with acid-base salt concentrations below 10%.

Construction method: deployment in strict proportion. First mix the curing agent and the paint thoroughly and cure for 15 minutes, then add the thinner. In the production process of this product, special consideration is given to the construction requirements, so it can be painted by brush, spray or roller. The supporting special topcoat construction generally adopts the construction technology of two bottoms and two sides or two bottoms and three sides. This product is a two-component reactive coating, which should be used within 4 hours after mixing.

Drying time: temperature 25 ℃, surface dry 30 minutes, hard dry 24 hours. Fully cured for 5-7 days.

Coating interval: more than 4 hours.

Storage: Cap tightly sealed. Store in a cool, clean, dry place. The shelf life is 2 years.

Surface treatment: remove floating rust and welding slag spatter on the surface of the workpiece, and carry out dust and oil removal.

Construction conditions: The humidity during construction is less than 75%, and the construction temperature is 5°C-40°C. Construction is strictly prohibited in rainy, snowy and foggy weather.

Safety and Precautions: Ensure that the construction site has good ventilation. Keep away from open flames, no smoking at the construction site, and avoid paint splashing on eyes and skin.

Supporting primer: anti-corrosion special primer
 

Table 1 Chemical medium resistance performance of fluorocarbon coatings

 

Item Result Item Result

Sulfuric acid (10%)

no change in March

Gasoline resistance (72d, 60°C and room temperature alternately)

no change

Sulfuric acid (40%)

no change in March

Daqing crude oil (122d, 60°C and room temperature alternately)

no change

Nitric acid (10%)

no change in March

Glycerin antifreeze (43d, alternate between 60°C and room temperature)

no change

Phosphoric acid (10%)

no change in december

Dimethyl phthalate (30d, same conditions as above)

No significant changes

Acetic acid (10%)

no change in december

Alcohol (50%, 112d, room temperature)

No significant changes

Sodium hydroxide (10%)

7d no change

Phosphoric acid (85%, 50°C, 30d)

No significant changes

Ammonia (10%) 

7d no change

Dichloroacetic acid (room temperature, 60d)

No significant changes

Sodium carbonate (10%)

no change in december

Bromine (room temperature, 60d)

No significant changes

Formaldehyde (37%)

September no change

Calcium chloride saturated solution (75°C, 53d)

No significant changes

Seawater (100%)

September no change

Saturated solution of sodium carbonate (75°C, 53d)

no change

Ethanol (95%)

no change in March

Potassium dichromate saturated solution (75°C, 53d)

no change

Toluene (100%)

>No change in March

   

 


  
Contact us
Dazhou Town Industrial Zone, Qujiang District, Quzhou City
Tel: + 86 570 3071 340
Mobile phone: + 86 133 6201 6666
E-mail: wentian@163.com
Mobile
Copyright(C)2023, Quzhou Wentian Chemical Co., Ltd. All Rights Reserved. Supported by  ChemNet ChinaChemNet Toocle
国产乱子伦精品久久| 超碰人人操在线观看| 婷婷天堂AV导航| 自拍中文人妻视频| 中文字幕亚洲影院| 久草免费中文视频| 亚州中文无码AV| www.99er| 久久亚洲无码国产黄色影音电影先锋| 大学生一级特黄大片| 五月成人丁香社区| 婷婷丁香五月麻豆| 国产另类在线亚洲麻豆探花| 欧美aaaa免费大片—亚洲国产| 日本一区二区在线| 伊人国产女人久久| 久久桃花视频在线| 五月精品在线一区| av网站免费线看| 不中病毒Av网站| 丁香九月综合激情| 色哟哟精品欧美97成人超碰在线| 五月五月婷婷亚洲女神| 伊人免费视频官网| 欧美日韩国产高清一区在线观看| 日皮视频国产黄色| 谁有精品可搜索AA网站呢| 九月激情丁香| 高潮喷水无码一级A不卡视频| 色鬼网站视频网站| 干熟妇在线视频午夜剧场一级A级| 91亚瑟美女视频| 丁香社区高清免费| 手机在线免费av| 亚洲一区2卡3丁香激情婷婷导航| 日韩欧美一区婷婷| 高清无码中文自慰| 久妖成人视频网站| 亚洲中文字幕无码破解视频| 手机最新Av网站| www.污污网站|